Project
modifications to the sludge line of the civil waste treatment plant
Location
Grosseto
Year
2021
Plant capacity
two sections each consisting of 2 parallel lines
Payload Line
160sq.m (total) for the first section, 120sq.m (total) for the second section
PAL Green Division was responsible for modifications on the sludge line of a civil waste water treatment plant in Grosseto. In particular, it has built a hub for the delivery and treatment of all biological sludge produced. The plant is divided into two parts, each with specific functions.